[hotfix][Connectors/AWS] Fix flink-connector-base dependency issue #53
Annotations
8 errors
compile_and_test (1.16.2) / compile_and_test (11)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 60 minutes.
|
compile_and_test (1.16.2) / compile_and_test (11)
The operation was canceled.
|
compile_and_test (1.17.1) / compile_and_test (11)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 60 minutes.
|
compile_and_test (1.17.1) / compile_and_test (11)
The operation was canceled.
|
compile_and_test (1.16.2) / compile_and_test (8)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 60 minutes.
|
compile_and_test (1.16.2) / compile_and_test (8)
The operation was canceled.
|
compile_and_test (1.17.1) / compile_and_test (8)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 60 minutes.
|
compile_and_test (1.17.1) / compile_and_test (8)
The operation was canceled.
|