Skip to content

[hotfix][Connectors/AWS] Fix flink-connector-base dependency issue #53

[hotfix][Connectors/AWS] Fix flink-connector-base dependency issue

[hotfix][Connectors/AWS] Fix flink-connector-base dependency issue #53

Triggered via push October 18, 2023 14:13
Status Cancelled
Total duration 1h 0m 30s
Artifacts

push_pr.yml

on: push
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
compile_and_test (1.16.2) / compile_and_test (11)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 60 minutes.
compile_and_test (1.16.2) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.17.1) / compile_and_test (11)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 60 minutes.
compile_and_test (1.17.1) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.16.2) / compile_and_test (8)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 60 minutes.
compile_and_test (1.16.2) / compile_and_test (8)
The operation was canceled.
compile_and_test (1.17.1) / compile_and_test (8)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 60 minutes.
compile_and_test (1.17.1) / compile_and_test (8)
The operation was canceled.