Skip to content

Merging-template-3.0.1 #683

Merging-template-3.0.1

Merging-template-3.0.1 #683

Re-run triggered October 11, 2024 09:00
Status Failure
Total duration 17m 48s
Artifacts

ci.yml

on: pull_request
Matrix: Test workflow parameters
Matrix: Run pipeline with test data
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Test workflow parameters (--skip_consensus_peaks)
The job was canceled because "_--skip_trimming" failed.
Test workflow parameters (--skip_consensus_peaks)
The operation was canceled.
Test workflow parameters (--aligner chromap)
The job was canceled because "_--skip_trimming" failed.
Test workflow parameters (--aligner chromap)
The operation was canceled.
Test workflow parameters (--aligner star)
The job was canceled because "_--skip_trimming" failed.
Test workflow parameters (--aligner star)
The operation was canceled.
Test workflow parameters (--aligner bowtie2)
The job was canceled because "_--skip_trimming" failed.
Test workflow parameters (--aligner bowtie2)
The operation was canceled.
Run pipeline with test data (latest-everything)
Process completed with exit code 1.
Run pipeline with test data (24.04.2)
The job was canceled because "latest-everything" failed.
Run pipeline with test data (24.04.2)
The operation was canceled.
Test workflow parameters (--skip_trimming)
Process completed with exit code 1.