Skip to content

CI

CI #7378

Triggered via schedule July 21, 2023 00:26
Status Failure
Total duration 2h 15m 32s
Artifacts

ci.yaml

on: schedule
Matrix: Emirge installation
Matrix: Examples
Matrix: Production testing
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
Examples (porter)
The self-hosted runner: porter lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
Examples (ubuntu-latest)
The job was canceled because "porter" failed.
Examples (ubuntu-latest)
The operation was canceled.
Production testing (porter)
File was unable to be removed Error: EBUSY: resource busy or locked, unlink '/shared/home/githubrunner/actions-runner/_work/mirgecom/mirgecom/.miniforge3/lib/.nfs00000000035f663100000007'
Production testing (ubuntu-latest)
The job was canceled because "porter" failed.
Production testing (ubuntu-latest)
The operation was canceled.
Production testing (macos-latest)
The job was canceled because "porter" failed.
Production testing (macos-latest)
The operation was canceled.
Documentation
Process completed with exit code 2.
Production testing (porter)
Unable to clean or reset the repository. The repository will be recreated instead.