Skip to content

Integration

Integration #161

Manually triggered August 27, 2023 14:22
Status Failure
Total duration 37m 56s
Artifacts

integration-build.yml

on: workflow_dispatch
Matrix: scheduled
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 3 warnings
scheduled (3.9)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
scheduled (3.9)
The operation was canceled.
scheduled (3.8)
The operation was canceled.
scheduled (3.10)
The operation was canceled.
scheduled (3.9)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2, actions/setup-python@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
scheduled (3.8)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2, actions/setup-python@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
scheduled (3.10)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2, actions/setup-python@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/